Completed in June 2023, this 2,220 m² triple-span structure was designed to cover silage clamps, a slurry tank, and farmyard areas, improving operational efficiency across the site. Built safely around ongoing farm activity, the project demonstrated strong planning and delivery.
Featuring rainwater harvesting linked to a poultry unit and a design that reduces phosphate run-off into local watercourses, the build combines environmental responsibility with durable, high-quality construction.