Timmins Engineering & Construction ltd led the design of the new facility to ensure that the project was deigned with maximum efficiency for the users in mind whilst at the forefront of modern crop storage technology.
The original buildings were demolished and materials separated with all brick, block & concrete graded, crushed and screened on site to be re-used for the sub-base of the new buildings to retain all materials on site.